mileno
design works
situated works
informations
Mark
2022
PPM.18(D.)
PPM.18(C.)
PPM.18(B.)
PPM.18(A.)
PPL.18(R.)
PPL.18(Q.)
PPL.18(P)
PFP.18(B)
PPL.18(O)
PPL.18(N.)
PMT.19(A)
PCM.20(A)
PPL.18(M.)
PPL.18(L)
PPL.18(K)
PPP.18(B.)
PPL.18(J)
SSM.50.450(A)
PPL.18(I.)
PPL.18(H)
PPL.18(G)
PPL.18(F)
PPL.18(E)
PPL.18(D)
PFP.18(A.)
PPL.18(C)
XXD.V(A)
SLM.30.30(A)
SPL.18.420(A.)
VPL.18.360.420(A.)
PPL.18(B)
PPP.18(B)
ZPML.18(A.)
SXB.40.40(A.)
2021
PPP.18(A.)
PPL.18(A)
SCG.20.40(A.)
SPT.19.200(A.)
GCR.20(A.)
SLM.100.100(A)
SSM.20.100(A)
PML.18(A.)
DPV.32(A.)
SSM.22.100(C.)
SSM.23.23(A)
PMD.15(A)
PMD.18(A)
2020
PSMD.18.28.28(A)
DBB.V(A)
SSM.18.30(A)
SCM.20.60(A.)
SSM.22.100(B.)
SSM.22.100(A.)
GTC.40.30(A.)
GLM.30(A.)
SLB.34.52(A)
PPP.15(A)
SLM.40.40(A)
Mark
PPP.15(A)
2019
project information
︎︎︎
Mark